01 / BUILDING SERVICES
Commercial & residential
Demand, refill, booster interfaces and maintainable storage for offices, apartments and mixed-use buildings.
DECCA / WATER TANK APPLICATIONS
Find GRP water storage for your building or water duty. Decca helps turn your brief into a suitable tank proposal.
Selection help · Drawing review · Agreed installation support

Tank selection brings together the stored water, required usable volume, delivery route and maintenance plan. These guides help you prepare a clear brief for Decca and your system designer.
Showing all six application guides.
01 / BUILDING SERVICES
Demand, refill, booster interfaces and maintainable storage for offices, apartments and mixed-use buildings.
02 / EDUCATION
Teaching-day peaks, accommodation, campus differences and planned holiday operation.
03 / HOSPITALITY
Guest services, showers, kitchens, events and seasonal occupancy.
04 / FIRE SYSTEMS
Effective reserve, suction arrangements, approval requirements and designer-led selection.
05 / INDUSTRY
Fluid specification, temperature, batch demand, controls and material compatibility.
06 / RAINWATER
Collection, intended reuse, mains backup, separation and above-ground installation.
| What will it store? | Source, water quality, temperature and any additives. |
|---|---|
| How much is usable? | Required litres, capacity basis, demand and refill assumptions. |
| How will it reach the room? | Complete body, two sections or individual panels; measure the route and working space. |
| How will it be maintained? | Safe top/fittings access, isolation, drainage and required continuity. |
A complete moulded body where the route and positioning space allow.
Two body sections with space for the sealed joint to be assembled.
On-site panel assembly with IFB, EFB, IF or TIF construction.
COMBINATION UNITS / SITE PLANNING
Combination units bring water storage and a separate equipment chamber into one enclosure. Discuss the water duty, connections, site access and delivery arrangements with Decca when reviewing the project.


Use dimensions, required litres or available room space in the detailed calculator. Review the connections and water levels, then download a project-specific technical planning PDF or carry the result into your enquiry.
State any potable-water, fire-system or project-specific approval requirements at enquiry stage. Ask for evidence covering the selected product and duty.
Decca does not hold LPCB LPS 1276 certification. Projects requiring that certification need an appropriate approved supply route.
Decca helps turn your brief into a tank proposal: compare constructions, review the layout and connections, then agree manufacture and supply. Installation can be included, with any testing, cleaning, disinfection and handover requirements set out in the quotation. Your responsible designer confirms system demand and structural requirements.
The application guides support product selection and quotation. They do not replace a building-services, fire, water-hygiene or process-system design. Confirm final product suitability and installation details for the project.